BURSA INTEGRATED HEALTH CAMPUS
Bursa Integrated Health Campus is built on an area of 745,500 m2 in the Nilufer district of Bursa. Commissioned by the Ministry of Health with the Public–Private Partnership model, the hospital project has completed in 2019 and since then it has been serving Bursa and the neighboring provinces.
Equipped with world-class cutting-edge isolators, the Bursa City Hospital will continue to seamlessly carry out all its operations, even during and after the most severe earthquake scenarios.
Designed to include three different hospitals with a combined bed capacity of 1,355, the project comprises a 1,055-bed Main Hospital, a 200-bed Physical Therapy and Rehabilitation Hospital and a 100-bed High Security Forensic Psychiatry Hospital. The main hospital facility consists four buildings surrounding a shared core building and includes the following hospitals:
General Hospital with a bed capacity of 283
Cardiovascular Diseases Hospital with a bed capacity of 271
Oncology Hospital with a bed capacity of 250
Maternity and Children’s Hospital, a General Hospital and a Psychiatry Hospital with a combined bed capacity of 251
INTERIOR DESIGN
PROJECT FACTS
LAND
Location Bursa, Turkey
Land Owner Ministry of Health of the Republic of Turkey
CLIENT
Renaissance Construction
PROJECT DATE
2016-2019
PROJECT DATA
Capacity 1355 beds
Total Construction Area 459.000 m²
Total Landscape Area
PROJECT TEAMS
Architectural Project Yazgan Design Architecture
Structural Project EFK Engineering
Mechanical Project GMD Engineering
Electrical Project Yurdakul Engineering
Infrastructure Project Noktasal Engineering
Landscape Project
CONSULTANTS
Fire Consultants Alara Project